Пошук
Зараз показуються 1-1 з 1
Field preparation of long excavatory pillars in the conditions of the Western Donbass mines
(2020)
Purpose. Reduce the cost of preparing pillars up to 3000 m in length.
Methods. The analytical method of research was used to analyze the mining-geological conditions of the field development, the production situation for ...