Justification of drill and blast pattern designs for ore treatment before in-situ leaching
Datum
2021Autor
Lyashenko, V. I.
Khomenko, O. E.
Andreev, B. N.
Golik, V. I.
Metadata
Zur LanganzeigeZusammenfassung
The article discusses drill and blast pattern designs for ore treatment before in-situ leaching (ISL) in ore bodies of complex structure with a view to ensuring ecological safety, enhanced ISL efficiency, as well as balanced subsoil protection and management. This is achievable using cut-and-fill method with cemented backfill of different composition and strength, as well as with other geotechnical methods. It is shown that ISL of metals from solid ore requires high-quality preparation of large volume blocks, associated with blasting of tens of tones of explosives at a time. Rock fragmentation by blasting is improved through the higher powder factor to 2.9–3.3 kg/m3, as well as through accumulation of rocks with a degree of fragmentation not less than Kf = 1.2–1.3 in a limited space at the bottom of a stope. A case study of the concurrent application of a conventional mining technology and ISL technology in the Michurin deposit, on level 26–21 m, at the ISL block width of 20 m and shrinkage height of 35 to 50 m has proved the required stability of roof spans, without any falls of oversizes or off-standard sizes to ISL ore blocks. The recommendations for the design approaches to ISL are developed and tested in mined-out stopes in test block 5-86 and in pilot production blocks 5-84-86, 5-88-90 and 1-75-79.