Developing parameters of well construction method in terms of thick sediments
Abstract
The paper is compiled in accordance with the requirements of the guidelines. It contains information about the drilling area, geological structure and characteristics of productive horizons. Also, in the design part, issues of well construction are resolved: design of the well structure, selection of equipment for a drilling rig, rock cutting tools, drilling and cementing technology. A description of possible accidents and com-plications and their prevention is given. The issues of subsurface and environmental protection during well construction are highlighted. The estimate of the well construc-tion are calculated.