Mamdouh Naser Mohamed Salama Ellakany2021-09-292021-09-292021-07Кваліфікаційна роботаhttp://ir.nmu.org.ua/handle/123456789/159145The paper is compiled in accordance with the requirements of the guidelines. It contains information about the area of drilling, geological structure and characteristics of productive horizons. In the design part, the issues of well construction are resolved: the well structure has been designed, the equipment for the drilling rig, the rock cutting tool, the drilling and cementing technology have been selected. Measures have been developed to improve the quality of drilling fluids during preparation. Safety precautions are given when drilling wells. The issues of subsoil and environmental protection are highlighted. The estimate of well drilling has been substantiated.The object of the study is drilling a well in terms of the Skorokhodovsky gas condensate field with theThe object of the study is drilling a well in terms of the Skorokhodovsky gas condensate field with the development of measures to improve the quality of drilling fluids. development of measures to improve the quality of drilling fluids.enPRODUCTION WELL, SKEW WALL, COMPLICATION, DRILLING FLUID PREPARATIONTechnical project for drilling an exploration and production well in terms of Skorokhodivsky oil and gas condensate depositLearning Object