Omar Sayed Hassan Zeinhom2021-09-282021-09-282021-07Кваліфікаційна роботаhttp://ir.nmu.org.ua/handle/123456789/159129The paper is compiled in accordance with the requirements of the guidelines. It contains information about the drilling area, geological structure and characteristics of productive horizons. Also, in the design part, issues of well construction are resolved: design of the well structure, selection of equipment for a drilling rig, rock cutting tools, drilling and cementing technology. A description of possible accidents and complications and their prevention is given. The issues of subsurface and environmental protection during well construction are highlighted. The estimate of the well construction are calculated.The object of research is the construction of a well in terms of Sakhalinsky deposit with the development of effective methods for well development. The objective of the paper is to develop a project for drilling a well in terms of Sakhalinsky deposit.enINCREASE IN PRODUCTIVITY, WELL, BIT, DRILL, RIG.Technical project for drilling an exploration and production well at Sakhalinsky oil and gas condensate depositТехнічний проект буріння розвідувальноексплуатаційної свердловини на Сахалінському нафтогазоконденсатному родовищіLearning Object