Показати скорочений опис матеріалу

dc.contributor.authorMoustapha, Mbengue
dc.date.accessioned2024-09-09T12:51:06Z
dc.date.available2024-09-09T12:51:06Z
dc.date.issued2022-07
dc.identifier.urihttp://ir.nmu.org.ua/handle/123456789/167694
dc.descriptionThe thesis is compiled in accordance with the requirements of the guidelines. Contains information about the area of drilling, geological structure and characteristics of productive horizons. In the design part, the issues of well construction are resolved: the well structure has been designed, the equipment for the drilling rig, the rock cutting tool, the drilling and cementing technology have been selected. Measures have been developed to improve the quality of drilling fluids during preparation. Safety precautions are given when drilling wells. The issues of subsoil and environmental protection are highlighted. The estimate of well drilling has been substantiateduk_UA
dc.description.abstractThe purpose of the work is to design a well at the Diam Niadio field (Senegal).uk_UA
dc.language.isoenuk_UA
dc.publisherНТУ "Дніпровська політехніка"uk_UA
dc.subjectPRODUCTION WELL, SKEW WALL, COMPLICATION, DRILLING FLUID PREPARATION.uk_UA
dc.titleTechnical project for drilling an exploration well in the Diam Niadio field (Senegal)uk_UA
dc.typeLearning Objectuk_UA


Долучені файли

Thumbnail

Даний матеріал зустрічається у наступних фондах

Показати скорочений опис матеріалу