Показати скорочений опис матеріалу

dc.contributor.authorMostafa Hassan Mohamed Abdelbaset
dc.date.accessioned2021-09-28T12:50:40Z
dc.date.available2021-09-28T12:50:40Z
dc.date.issued2021-07
dc.identifier.citationКваліфікаційна роботаuk_UA
dc.identifier.urihttp://ir.nmu.org.ua/handle/123456789/159130
dc.descriptionThe paper is compiled in accordance with the requirements of the guidelines. It contains information about the drilling area, geological structure, and characteristics of productive horizons. In addition, the design part resolves the following issues of well construction: the well structure has been designed; the equipment of the drilling rig, rock cutting tools, drilling and cementing technology have been selected. Safety precautions are given when drilling wells. The issues of subsoil and environmental protection are highlighted. The estimate for drilling a production well has been substantiated.uk_UA
dc.description.abstractThe object of research is a technical project for drilling a gas well in the Yulievska area. The purpose of the work is to develop a technology for drilling a gas production well in terms of Yulievska area.uk_UA
dc.language.isoenuk_UA
dc.publisherНТУ "Дніпровська політехніка"uk_UA
dc.subjectPRODUCTION WELL, FLUSHING FLUID, OPENINGuk_UA
dc.titleTechnical project for drilling a production well in terms of Yuliyivsky oil and gas condensate deposituk_UA
dc.title.alternativeТехнічний проект буріння експлуатаційної свердловини в умовах Юліївського нафтогазоконденсатного родовищаuk_UA
dc.typeLearning Objectuk_UA


Долучені файли

Thumbnail

Даний матеріал зустрічається у наступних фондах

Показати скорочений опис матеріалу