Показати скорочений опис матеріалу

dc.contributor.authorMamdouh Naser Mohamed Salama Ellakany
dc.date.accessioned2021-09-29T07:56:47Z
dc.date.available2021-09-29T07:56:47Z
dc.date.issued2021-07
dc.identifier.citationКваліфікаційна роботаuk_UA
dc.identifier.urihttp://ir.nmu.org.ua/handle/123456789/159145
dc.descriptionThe paper is compiled in accordance with the requirements of the guidelines. It contains information about the area of drilling, geological structure and characteristics of productive horizons. In the design part, the issues of well construction are resolved: the well structure has been designed, the equipment for the drilling rig, the rock cutting tool, the drilling and cementing technology have been selected. Measures have been developed to improve the quality of drilling fluids during preparation. Safety precautions are given when drilling wells. The issues of subsoil and environmental protection are highlighted. The estimate of well drilling has been substantiated.uk_UA
dc.description.abstractThe object of the study is drilling a well in terms of the Skorokhodovsky gas condensate field with theThe object of the study is drilling a well in terms of the Skorokhodovsky gas condensate field with the development of measures to improve the quality of drilling fluids. development of measures to improve the quality of drilling fluids.uk_UA
dc.language.isoenuk_UA
dc.publisherНТУ "Дніпровська політехніка"uk_UA
dc.subjectPRODUCTION WELL, SKEW WALL, COMPLICATION, DRILLING FLUID PREPARATIONuk_UA
dc.titleTechnical project for drilling an exploration and production well in terms of Skorokhodivsky oil and gas condensate deposituk_UA
dc.typeLearning Objectuk_UA


Долучені файли

Thumbnail

Даний матеріал зустрічається у наступних фондах

Показати скорочений опис матеріалу