Показати скорочений опис матеріалу

dc.contributor.authorOmar Nabil Mohamed Mohamed Elmarasy
dc.date.accessioned2021-10-25T14:59:23Z
dc.date.available2021-10-25T14:59:23Z
dc.date.issued2021-07
dc.identifier.citationКваліфікаційна роботаuk_UA
dc.identifier.urihttp://ir.nmu.org.ua/handle/123456789/159289
dc.descriptionThe paper is compiled in accordance with the requirements of the guidelines. It contains information about the drilling area, geological structure and characteristics of productive horizons. Also, in the design part, issues of well construction are resolved: design of the well structure, selection of equipment for a drilling rig, rock cutting tools, drilling and cementing technology. A description of possible accidents and complications and their prevention is given. The issues of subsurface and environmental protection during well construction are highlighted. The estimate of the well construction are calculated.uk_UA
dc.description.abstractThe object of research is the construction of a well in terms of Sakhalinsky deposit with the development of effective methods for well development. The objective of the paper is to develop a project for drilling a well in terms of Sakhalinsky deposit.uk_UA
dc.language.isoenuk_UA
dc.publisherНТУ "Дніпровська політехніка"uk_UA
dc.subjectINCREASE IN PRODUCTIVITY, WELL, BIT, DRILL, RIG.uk_UA
dc.titleDevelopment of methodological basis for the technology of intensification of oil movement in reservoir bedsuk_UA
dc.title.alternativeРозробка методичних основ технології інтенсифікації руху нафти в пластах-колекторахuk_UA
dc.typeLearning Objectuk_UA


Долучені файли

Thumbnail

Даний матеріал зустрічається у наступних фондах

Показати скорочений опис матеріалу