Будь ласка, використовуйте цей ідентифікатор, щоб цитувати або посилатися на цей матеріал:
http://ir.nmu.org.ua/handle/123456789/167699
Назва: | Technical project for drilling an exploration well in the Abu Ghirab field (Iraq) |
Автори: | Taha, Mohammad |
Ключові слова: | PRODUCTION WELL, SKEW WALL, COMPLICATION, DRILLING FLUID PREPARATION |
Дата публікації: | чер-2022 |
Видавництво: | НТУ "Дніпровська політехніка" |
Короткий огляд (реферат): | Research tools - literature analysis and theoretical research. |
Опис: | The thesis is compiled in accordance with the requirements of the guidelines. Contains information about the area of drilling, geological structure and characteristics of productive horizons. In the design part, the issues of well construction are resolved: the well structure has been designed, the equipment for the drilling rig, the rock cutting tool, the drilling and cementing technology have been selected. Measures have been developed to improve the quality of drilling fluids during preparation. Safety precautions are given when drilling wells. The issues of subsoil and environmental protection are highlighted. The estimate of well drilling has been substantiated. |
URI (Уніфікований ідентифікатор ресурсу): | http://ir.nmu.org.ua/handle/123456789/167699 |
Розташовується у зібраннях: | 2021-2022 навчальний рік |
Файли цього матеріалу:
Файл | Опис | Розмір | Формат | |
---|---|---|---|---|
qualifying work degree bachelor - Taha Mohammad.pdf | Кваліфікаційна робота | 3,71 MB | Adobe PDF | Переглянути/Відкрити |
Усі матеріали в архіві електронних ресурсів захищені авторським правом, всі права збережені.