Publication:
Work and operation of the preventer unit

Loading...
Thumbnail Image

Date

Authors

Tymoshenko, O. G.

Koroviaka, Ye. A.

Journal Title

Journal ISSN

Volume Title

Publisher

DOI

Research Projects

Organizational Units

Journal Issue

Abstract

The preventive installation is mounted under the base of the tower block. Depending on the conditions of the well wiring, the mouth can be equipped with a preventive device already when drilling a shaft under a casing with a diameter of 377 mm. This is how exploratory and sea wells were equipped in new areas. The installation and operation of preventive installations must be carried out in accordance with the safety rules in the oil and gas production industry. The preventer unit is pressurized with water at the pressure allowed by the casing (but not more than the test pressure of the unit) for 30 minutes.

Description

Citation

Tymoshenko O. G. Work and operation of the preventer unit / Tymoshenko O. G., Koroviaka Ye. A. // Молодь: наука та інновації : матеріали ХІ Міжнародної науково-технічної конференції студентів, аспірантів та молодих вчених, Дніпро, 22–24 листопада 2023 року. – Дніпро : НТУ ДП, 2023. – Т. 2. – С. 361-362.

Endorsement

Review

Supplemented By

Referenced By