RESEARCH ON MEASURES TO PREVENT WELLBORE DEVIATION BY USING RIGID BOTTOM HOLE ASSEMBLIES
Date Issued
2024
Author(s)
Slauta A. A.
Editor(s)
Khomenko V. L.
Goptarevskyi S. D.
Abstract
One of the main problems during drilling is spontaneous deviation of the wellbore from the vertical, which leads to increased costs, difficulties with drilling process control and a decrease in the overall drilling efficiency.
Subjects
File(s)![Thumbnail Image]()
Loading...
Name
molod-2024-vol3-289-290.pdf
Size
448.02 KB
Format
Adobe PDF
Checksum
(MD5):6bcfb045aa926f5226058d21f2a87a88
